Account protection
The account is not locked now
After 5 wrong sign-in attempts in a row, sign-in pauses for 15 minutes, then reopens by itself or with a password reset.
Encrypted connection · Version 1.0.0
Account protection
After 5 wrong sign-in attempts in a row, sign-in pauses for 15 minutes, then reopens by itself or with a password reset.
Encrypted connection · Version 1.0.0