Duroob fleet tracking
Data TimeFleet trackingLive tracking of 240 vehicles with geofences and fuel reports.
Who receives its tickets
The team is set on the system; the supervisor is the team’s. Figures: their open tickets here out of their whole load.
- HZHaifa Al-ZahraniTeam supervisor0of 0
- OBOmar BawazirMobile developer1of 2
- DMDana Al-MalkiIntegration & API specialist0of 0
Team’s internal instructions
Shown to staff only while working; never reaches the client.
Teltonika FMB920 devices; devices silent over 30 minutes show on the grafana board.
Tickets on this system
Everything its clients raised on it; every one of them reads its team from the system.
Display options
| Time left of its priority’s resolve target, or how far past it; the clock pauses while the client is asked for information. | Actions | |||||
|---|---|---|---|---|---|---|
Fuel report differs from station invoicesDTM-2026-0413·Question | In progress | Medium | Nearing SLA· 3h 53m left | OBOmar BawazirAvailable | yesterday |
System history
Every change to it from the audit log: who, when, the value before and after, and the reason.
20 January 2025
Milestone: Duroob fleet tracking was added to the catalogue
2025-01-20 09:00
Added to the catalogue 670 days ago.
About the system
- Provider company
- Data Time
- Product line
- Fleet tracking
- Link
- fleet.duroob.sa
- Technology
- Go · TimescaleDB · Teltonika
- Added to the catalogue
- 2025-01-20 09:00
No other copies of the product
This system is alone on its product line.
Separate copies of one product can show the same fault, and are then grouped under one parent ticket.
