Demo clockDark mode

Sanad design system

Every piece of Sanad, in every state

The components Sanad’s three portals — admin, the support desk and the client portal — are built from, live in Arabic and English, light and dark, and in both company identities. What changes here changes on every screen that uses it.

Dark mode
component groups
11
live specimens
110

The two identities

Sanad wears the identity of the company whose domain it was opened from: Data Time or Real Solutions — client portal, support desk and admin alike. An identity is one attribute, «data-brand», on any element, and everything under it takes its colours — the same piece draws in both identities without one extra line.

The two identities side by side

Each column is a wrapper in its identity: the mark and name, a small hero band, the base colours with their token names, two buttons and a badge. Flip light and dark with the switch at the top of the page to see both modes.

data-brand · DataTimeMark · Rs4itMark · BrandLogo · CompanyLogo · BrandMotif · SanadMark

This page’s identity right now:data-brand="…"

Data Time

Bright blue to violet, with cyan touches

data-brand="datatime"
Data TimeSystems that run on time, support that arrives on time
Data Time for Information Technology

Open tickets

14

⁦3⁩ of them near their SLA

Every portal on Data Time’s domain: admin, the support desk and clients, and their messages

Base colours

  • --brand
  • --accent
  • --deep
  • --canvas
  • --surface
  • --sunken
  • --ink
  • --ink-3
In progress

Real Solutions

Deep royal blue and indigo, with teal touches

data-brand="rs4it"
Real SolutionsReal technology solutions for real businesses
Real SolutionsReal Solutions · RS4IT

Open tickets

14

⁦3⁩ of them near their SLA

Every portal on Real Solutions’ domain: admin, the support desk and clients, and their messages

Base colours

  • --brand
  • --accent
  • --deep
  • --canvas
  • --surface
  • --sunken
  • --ink
  • --ink-3
In progress

Every text-on-ground pair in both identities is measured at 7:1 or better, light and dark. tests/kit/contrast-aaa.test.ts

Both identities run on the Sanad platform — its small mark sits in the footer and on sign-in.

The shared hue scale

Twelve hues, each with a quiet ground («soft»), a text colour («ink») and a solid for dots and bars, never text. Statuses, priorities and SLA timers all name a hue from here, so they read the same in both identities.

--hue-X · --hue-X-soft · --hue-X-ink
Text on its ground
--hue-slate
Text on its ground
--hue-blue
Text on its ground
--hue-indigo
Text on its ground
--hue-violet
Text on its ground
--hue-teal
Text on its ground
--hue-green
Text on its ground
--hue-amber
Text on its ground
--hue-orange
Text on its ground
--hue-red
Text on its ground
--hue-rose
Text on its ground
--hue-cyan
Text on its ground
--hue-sky

The eight organisation tones

Each client organisation gets one of eight tones for its badge, its avatar and its touch in its portal. Chosen when the client is added; it never follows the identity.

--org-1 … --org-8
1--org-12--org-23--org-34--org-45--org-56--org-67--org-78--org-8

Support-desk atoms

The vocabulary all three portals speak: a ticket’s status, its SLA and priority, where it came from and where its notice goes, and who may act. Every piece carries its word with its colour and shape, so nothing is read by colour alone.

Ticket state

What staff see, and what the client sees, about the same ticket.

Ticket status

The support team’s language: the ten statuses with their word and colour. In the inbox, the ticket page and reports. `hint` adds the status’s explanation on hover.

TicketStatusBadge

The ten statuses

Awaiting assignmentAvailable to takeAssignedIn progressAwaiting clientAwaiting internal actionResolvedClosedReopenedCancelled

Both sizes

In progressIn progressAwaiting client

Status as the client sees it

The client portal never shows internal routing states: the ten statuses fold into five, and colour is reserved for what waits on the client. Use it on every screen a client reads.

ClientStatusBadge
Staff seeThe client sees
  • Awaiting assignmentUnder review
  • Available to takeUnder review
  • AssignedUnder review
  • In progressIn progress
  • Awaiting clientAwaiting your reply
  • Awaiting internal actionIn progress
  • ResolvedAwaiting your confirmation
  • ClosedClosed
  • ReopenedIn progress
  • CancelledClosed

The client’s stations

Four stations: received → in progress → resolved → closed. The current one pulses and says «awaiting your reply» when the ball is in the client’s court. On the portal’s ticket page; `compact` for its cards.

ClientStageTrack

Full, with labels

Under review
  1. 1Received
  2. 2In progress
  3. 3Resolved
  4. 4Closed
In progress
  1. Received
  2. 2In progress
  3. 3Resolved
  4. 4Closed
Awaiting your reply
  1. Received
  2. 2In progressAwaiting your reply
  3. 3Resolved
  4. 4Closed
Awaiting your confirmation
  1. Received
  2. In progress
  3. 3ResolvedAwaiting your confirmation
  4. 4Closed
Closed
  1. Received
  2. In progress
  3. Resolved
  4. Closed

A slim bar for a card

Under review
In progress
Awaiting your reply
Awaiting your confirmation

Time and SLA

The priority sets the target; the timer counts it from the status history.

Priority

Signal bars with the name from master data. Beside every ticket, in the filters and in the impact × urgency matrix.

PriorityBadge
CriticalHighMediumLow

Both sizes

CriticalHighMediumLow

SLA chip

The SLA state with the time left or how late it is. In table cells and cards where the room is one line.

SlaChip
Within SLA· ⁦5⁩h ⁦12⁩m leftNearing SLA· ⁦38⁩m leftSLA breached· ⁦1⁩h ⁦35⁩m lateClock pausedMet the SLAMissed the SLA

Both sizes

Within SLA· ⁦5⁩h ⁦12⁩m leftNearing SLA· ⁦38⁩m leftSLA breached· ⁦1⁩h ⁦35⁩m lateNearing SLA

Live SLA timer

Ticks with the demo clock: a ring of the target used, the time left or overdue, and it stops while the ticket waits on the client. In the ticket page’s header; `inline` for a table cell.

SlaTimer · SlaTimer variant="inline"
DTM-2026-0418High

Running — high

31%Within SLA⁦5⁩h ⁦32⁩m leftTarget ⁦8⁩h

Inline

Within SLA· ⁦5⁩h ⁦32⁩m left
RS4-2026-0193Critical

Near — critical

87%Nearing SLA⁦32⁩m leftTarget ⁦4⁩h

Inline

Nearing SLA· ⁦32⁩m left
DTM-2026-0402Medium

Paused — awaiting client

Clock pausedWaiting for the clientTarget ⁦1⁩d · paused ⁦20⁩h ⁦8⁩m

Inline

Clock paused
RS4-2026-0187High

Breached — high

143%SLA breached⁦3⁩h ⁦28⁩m lateTarget ⁦8⁩h

Inline

SLA breached· ⁦3⁩h ⁦28⁩m late

Ticket number

The client’s number in a fixed-width face, isolated left-to-right so it never flips inside an Arabic sentence. `strong` where it heads the row.

TicketNumber
DTM-2026-0412RS4-2026-0187DTM-P-0007

Your ticket DTM-2026-0412 has reached the web team.

Channels and messages

Where the ticket came from, where the notice goes, and what happened to the message.

Source and channel

Where a ticket or message came from, and the client’s notification channel: a WhatsApp group with its member count, a direct number, or email. A broken channel is red and stops sends until it is fixed.

SourceBadge · ChannelBadge

Sources

PortalWhatsAppEmailSupport teamSystem

Notification channels

WhatsApp groupAl-Rashed IT9Direct WhatsApp number+966 55 402 6693Emailit@duroob.saDirect WhatsApp number+966 59 870 2214WhatsApp group14

Delivery state

WhatsApp ticks with the word, in the message log and under every reply sent. `iconOnly` for tight places, the word in the tooltip.

DeliveryState

With the word

QueuedSentDeliveredReadFailedSkipped

Tick only

QueuedSentDeliveredReadFailedSkipped

Never sent — no ticks, the skip reason in the tooltip

SkippedSkipped — WhatsApp is off for this clientSkippedSkipped — WhatsApp is not configured on the serverSkippedSkipped — the client turned this kind offSkippedSkipped — email is not enabled in the demoSkippedSkipped — no number to send toSkipped — WhatsApp is off for this client

WhatsApp message preview

How the message looks on the client’s phone: in the template editor, and in «what the client receives» before sending. Variables are filled with their values; an empty one stays visible so it is caught before sending.

WhatsAppMessagePreview

Variables filled

DData Time SupportVerified business account

Ticket reply

New reply on your ticket DTM-2026-0412: We updated the payment gateway settings and restarted the service. Please try a payment now and let us know.

10:41

A variable left empty

DData Time SupportVerified business account

Resolution done

Your ticket DTM-2026-0398 is resolved. Action: Renewed the Fatoora integration certificate. Confirm the closing on the portal: {{3}}

09:12

A change and where it came from

In the ticket log and the audit log: the old value struck through, then the new one in the reading direction, and how the act arrived — in the app, over MCP with the key’s name, over WhatsApp, or automatically.

FromToDiff · ViaBadge

From → to

In progressAwaiting clientMediumHighLama Al-GhamdiSultan Al-MutairiAwaiting assignment

How it arrived

In the appOver MCP· claude-desktop-faisalOver WhatsAppAutomatically

People and catalogue

Who works the ticket, whose it is, and on which system.

Staff and client

A staff member by initials with an availability ring (available, busy, away, off duty); a client organisation by its initials in its tone of eight. ⚠️ The client portal never shows staff names or teams.

StaffAvatar · ClientAvatar

Staff

FOLGKSMSFOFaisal Al-OtaibiAvailableLGLama Al-GhamdiBusyKSKhalid Al-SubaieAwayMSMunira Al-SahliOff duty

Client organisations

ARNHDLACUFRWSDTFAR

Company, system and team

A provider company in its OWN identity wherever it appears, a system marked «stopped» when it stops, a team with its distribution mode. In tables, page headers and filters.

CompanyChip · SystemChip · TeamChip

The two companies

Data TimeReal SolutionsData TimeReal Solutions

Systems

Al-Rashed online storeAl-Ufuq parents appAl-Rashed online store

Teams

Web & Portals teamSelf-takeEnterprise Systems teamSupervisor assignsEnterprise Systems teamWithout the mode

Decisions and permissions

How the priority is suggested, who may act, and what happens next.

Impact × urgency matrix

Impact in rows, urgency in columns, each cell its suggested priority and response time. Pick a cell: the raise-a-ticket screen and the master-data tester use it.

ImpactUrgencyMatrix
Impact ↓ · Urgency →

Normal

Can wait; work goes on.

High

Disrupts part of the work.

Urgent

Work has stopped.

Wide

The whole organisation or its customers.

Moderate

A whole department or a branch.

Limited

One user or a few.

Suggested priority:High

A refused action

A control you may not use is shown DISABLED with the reason and the name of who holds the permission — never hidden. Tooltip by default; `inline` writes the reason under it.

PermissionGate

Allowed

Refused — reason in the tooltip

Only the team supervisor can do this: Faisal Al-Otaibi.

Refused — reason written out

The ticket is assigned to Lama Al-Ghamdi; replies and status changes are for its owner or the team supervisor.

What happens on confirm

Rule 14: a confirm says what will happen and to whom, line by line — tickets affected, who is notified, what is recomputed.

EffectList
  • ⁦6⁩ open tickets on «Mawid — Basma Dental» will be attached to the parent ticket, and their separate replies stop.
  • An update reaches ⁦3⁩ clients through their channels: two WhatsApp groups and a direct number.
  • Each attached ticket’s SLA is recomputed from its status history; its creation date does not change.
  • The team supervisor and the two staff who own the tickets are told.

Page frame

Every screen starts here: a header with breadcrumbs, title and purpose, or a deep hero band for dashboards — then sections and panels as quiet layers instead of white cards scattered on white.

Page header

Title, purpose and breadcrumbs come from the route map automatically, with actions, the «working on» chip and an optional row of figures.

PageHeader

Ticket inbox

The daily operating screen: tabs, filters and bulk actions.

Scope:Both companies
Open tickets
48

Since this morning

Near SLA
7
SLA breached
3+1
SLA compliance
⁦92%⁩

Hero band

For the desk and admin dashboards: the identity’s deep colour with a glow, a quiet dot field, the signal arcs and a lit hairline, with glass figure tiles and a change coloured by whether it is good or bad news. Only the key figure wears the accent.

PageHeader variant="hero"

Support desk · Web & Portals team

Good morning, Faisal

Seven tickets are nearing their SLA; the closest, «Mada payments fail on the Al-Rashed store», has 38 minutes left.

Open tickets
48−6

Since this morning

Near SLA
7

This week

SLA breached
3+1
SLA compliance
⁦92%⁩+2%

Target ⁦90%⁩

Section and panel

A section is a heading, a purpose and actions; a panel is the surface for a chart, list or table, with `flush` for an edge-to-edge table and `deep` for an important alert.

Section · Panel

Inbox by team

Tickets open right now, ordered by risk

Closest to their SLA

Within the next two hours

  • DTM-2026-0418In progressNearing SLA· ⁦38⁩m left
  • RS4-2026-0193AssignedNearing SLA· ⁦1⁩h ⁦4⁩m left
  • DTM-2026-0407ReopenedNearing SLA· ⁦1⁩h ⁦37⁩m left
Updated two minutes ago

A client channel is broken

The system number was removed from the «Basma Dental» WhatsApp group; four notices did not arrive. Fix the channel, then resend.

A panel with no inner padding

The signal arcs

The identity’s motif: arcs spreading from a point — a support that listens. Drawn in the current text colour at a whisper behind a hero band, at the foot of the side rail, or in an empty state.

BrandMotif

On a deep surface

On a light surface

Logs and boards

What is read in sequence and what is moved by hand: the ticket log says who did what and when, and the ticket board moves a ticket between its statuses by drag or by keyboard.

Ticket log

Who did what to which ticket, newest first and grouped by day, with relative time («3 hours ago») and a status change «from → to» with its badges. `compact` for a side panel on the ticket page.

ActivityFeed

Full — the ticket page

Today21 November 2026

  1. Status change: Turki Al-Anazi changed the status of DTM-2026-0420Main website down with a 502 errorIn progressAwaiting client

    2026-11-21 10:12
    We need a screenshot of the error at checkout, and the number of the last failed payment.
  2. Comment: Saud Al-Khalidi replied over WhatsApp on DTM-2026-0420Main website down with a 502 error

    2026-11-21 09:55
    Done, I sent the screenshot. It only happens with Mada cards; Apple Pay works.
    WhatsApp
  3. Assignment: Faisal Al-Otaibi assigned DTM-2026-0417Invoices rejected by the ZATCA platformAvailable to takeAssigned

    2026-11-21 09:20
    LGLama Al-GhamdiBusyOver MCP· claude-desktop-faisal
  4. Edit: Reem Al-Dossari raised the priority of DTM-2026-0399Nafath sign-in not workingMediumHigh

    2026-11-21 08:47
  5. Issue: Sanad recorded an SLA breach on DTM-2026-0399Nafath sign-in not working

    2026-11-21 07:05
    SLA breached· ⁦12⁩m lateAutomatically

Yesterday20 November 2026

  1. Document upload: Dr. Hala Al-Sudairi attached the error screenshot to DTM-2026-0402Login OTP not arriving

    2026-11-20 16:30
    payment-error.png · 240 KB
  2. Approval: Dr. Hala Al-Sudairi confirmed the fix and closed DTM-2026-0402Login OTP not arrivingResolvedClosed

    2026-11-20 14:05
  3. Rejection: Eng. Lina Al-Abdulkarim reopened RS4-2026-0396WhatsApp messages not showing on customer recordsClosedReopened

    2026-11-20 11:20
    The problem is back this morning: receipts print with yesterday’s date.

Compact — a side panel

Today21 November 2026

  1. Status change: Turki Al-Anazi changed the status of DTM-2026-0420Main website down with a 502 errorIn progressAwaiting client

    2026-11-21 10:12
  2. Comment: Saud Al-Khalidi replied over WhatsApp on DTM-2026-0420Main website down with a 502 error

    2026-11-21 09:55
    WhatsApp
  3. Assignment: Faisal Al-Otaibi assigned DTM-2026-0417Invoices rejected by the ZATCA platformAvailable to takeAssigned

    2026-11-21 09:20
    LGLama Al-GhamdiBusyOver MCP· claude-desktop-faisal
  4. Edit: Reem Al-Dossari raised the priority of DTM-2026-0399Nafath sign-in not workingMediumHigh

    2026-11-21 08:47
  5. Issue: Sanad recorded an SLA breach on DTM-2026-0399Nafath sign-in not working

    2026-11-21 07:05
    SLA breached· ⁦12⁩m lateAutomatically

Empty

No activity yet

Comments, approvals and status changes show up here as they happen.

Ticket board

Tickets in their status columns: drag a card to another column, or pick one up with Space and move it with the arrows. A column over its limit turns amber and says so.

KanbanBoard

Try it: drag a card into «In progress», or focus a card, press Space, then the arrows.

Available to take4 · ⁦4⁩ cards

DTM-2026-0417

Invoices rejected by the ZATCA platform

CriticalFatoora — Al-Rashed Group
Within SLA· ⁦5⁩h ⁦12⁩m leftWhatsApp
DTM-2026-0408

Mada and Apple Pay payments failing

CriticalAl-Rashed online store
Nearing SLA· ⁦1⁩h ⁦4⁩m leftWhatsApp
RS4-2026-0381

Invoice QR code won’t scan

MediumFatoora — Al-Jazira Plastics
Within SLA· ⁦5⁩h ⁦12⁩m leftWhatsApp
DTM-2026-0372

Store stock doesn’t match the warehouse

MediumSufrat Al-Deera ordering
Nearing SLA· ⁦1⁩h ⁦4⁩m leftWhatsApp

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Assigned2 · ⁦2⁩ cards

DTM-2026-0411

Appointment reminder SMS not reaching patients

HighMawid — Al-Nukhba Hospital
Within SLA· ⁦21⁩h leftEmail
Owner: Sultan Al-Mutairi
DTM-2026-0375

Same slot booked twice

HighMawid — Sufrat reservations
Within SLA· ⁦21⁩h leftEmail
Owner: Sultan Al-Mutairi

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

In progress6 · ⁦6⁩ cards

⁦6⁩ of ⁦5⁩Over the WIP limit
DTM-2026-0420

Main website down with a 502 error

CriticalDuroob hosting
Nearing SLA· ⁦38⁩m leftPortal
Owner: Turki Al-Anazi
DTM-2026-0405

Live Zoom session link won’t open

HighAl-Ufuq learning platform
Within SLA· ⁦1⁩d ⁦16⁩h leftSupport team
Owner: Khalid Al-Subaie
DTM-2026-0399

Nafath sign-in not working

CriticalAl-Nukhba patient portal
Within SLA· ⁦5⁩h ⁦12⁩m leftWhatsApp
Owner: Lama Al-Ghamdi
RS4-2026-0396

WhatsApp messages not showing on customer records

HighCRM — Tamkeen
SLA breached· ⁦1⁩h ⁦35⁩m latePortal
Owner: Yousef Al-Shammari
DTM-2026-0393

Most trucks’ GPS trackers offline

CriticalDuroob fleet tracking
Within SLA· ⁦21⁩h leftEmail
Owner: Dana Al-Malki
RS4-2026-0384

System very slow in the mornings

MediumAl-Jazira Plastics hosting
Nearing SLA· ⁦38⁩m leftPortal
Owner: Turki Al-Anazi

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Awaiting client3 · ⁦3⁩ cards

DTM-2026-0414

November payroll run fails

CriticalHR & payroll — Duroob
Clock pausedPortal
Owner: Yousef Al-Shammari
DTM-2026-0387

Month-end close is blocked

CriticalMawared — Al-Rashed Group
Clock pausedSupport team
Owner: Yousef Al-Shammari
DTM-2026-0378

WPS file rejected by Mudad

HighHR & payroll — Duroob
Clock pausedPortal
Owner: Yousef Al-Shammari

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Resolved1 · ⁦1⁩ card

DTM-2026-0402

Login OTP not arriving

CriticalAl-Nukhba app
Met the SLAPortal
Owner: Omar Bawazir

Space picks the card up, the arrow keys move it, Space drops it, Escape cancels.

Ticket card

The number and title (two lines at most), priority and system as tags, the SLA and source in the footer, the owner at the end. Any card works: `renderCard` takes what you give it.

KanbanCard

Cards in different states

DTM-2026-0420

Main website down with a 502 error

CriticalDuroob hosting
Nearing SLA· ⁦38⁩m leftPortal
Owner: Turki Al-Anazi
DTM-2026-0414

November payroll run fails

CriticalHR & payroll — Duroob
Clock pausedPortal
Owner: Yousef Al-Shammari
DTM-2026-0399

Nafath sign-in not working

CriticalAl-Nukhba patient portal
Within SLA· ⁦5⁩h ⁦12⁩m leftWhatsApp
Owner: Lama Al-Ghamdi

A card with a title only — no number, no owner

Charts

Sanad’s charts: drawn in SVG with no chart library, on fixed-order colour slots, thin marks, a quiet grid, a floating tooltip and a «Show as table» button that shows the same numbers as a real table. Time runs from the right in Arabic; digits are always Latin.

Chart frame and its states

Title, subtitle, legend and actions, and the «Show as table» button. Every chart has a loading state and a quiet empty state at its own height so the card never jumps.

ChartFrame · ChartLegend · ChartTooltip · TipCard

Tickets created vs resolved

Ready — try «Show as table»

  • Created
  • Resolved

Tickets created vs resolved

Loading

Tickets created vs resolved

No tickets in this period

No data to show yet

It appears here once the first value is recorded.

Area and line over time

One to four series over time, with a «today» marker and a labelled target line. The admin dashboard compares created with resolved day by day; first-response time reads against its target.

AreaLineChart

Tickets created vs resolved

Last 30 days — both companies

  • Created
  • Resolved

Median first-response time

In minutes, weekly

Tickets created vs resolved

Last 30 days

  • Created
  • Resolved

Columns and bars

Grouped or stacked, upright or horizontal for long Arabic names, with a target tick per category. To compare the two companies, the teams and the clients.

ColumnChart

Open tickets by priority

Per company

  • Critical
  • High
  • Medium
  • Low

Open tickets by priority

Per company

  • Critical
  • High
  • Medium
  • Low

Open per team by status

Stacked — long names as rows

  • In the queue
  • Being worked
  • Awaiting client

Resolved this week vs target

Per team

  • Resolved
  • Target

Donut and part of a whole

Part-to-whole at a glance (six parts at most), the total in the centre, the legend with value and share. `RingStat` is one value of a whole.

DonutChart · RingStat

Open tickets by status

48

open tickets

  • In the queue9⁦19%⁩
  • Assigned6⁦13%⁩
  • In progress16⁦33%⁩
  • Awaiting client11⁦23%⁩
  • Awaiting internal action4⁦8%⁩
  • Reopened2⁦4%⁩

Where tickets come from

Last 30 days

388

tickets

  • Portal182⁦47%⁩
  • WhatsApp141⁦36%⁩
  • Email38⁦10%⁩
  • Support team27⁦7%⁩

Gauge and nested rings

A share on an arc with its three zones and a tick at the target, the zone’s name written out — never colour alone. Nested rings for several shares together.

Gauge · RadialProgress

The SLA, dimension by dimension

This month

  • Response within SLA⁦95%⁩
  • Resolution within SLA⁦92%⁩
  • Not reopened⁦96%⁩
  • Solved on first reply⁦41%⁩

Trend spark

A word-sized trend for a table cell or a figure tile: its colour says whether the direction is good — fewer breaches going down is green. The target band is optional.

TrendSpark
IndicatorLatestLast 8 weeks
Open tickets48
SLA breached3
SLA compliance⁦92%⁩
Client satisfaction4.6
Reopened2

With a target band · in the identity colour · flat

Bubble map

The clients at a glance: monthly volume across, SLA breach rate up, bubble area the number of systems, colour the company. Click a bubble to open the client.

BubbleChart

Clients: volume vs SLA breaches

Last 30 days

  • Data Time
  • Real Solutions
Systems · 3

Radar

A profile over 3 to 10 axes: the first solid with a light wash, the second dashed as a target. To compare how teams perform.

RadarChart

Team performance

Out of 5 — this month

  • Web & Portals team
  • Management target
  • Enterprise Systems team

Team performance

Infrastructure & Hosting team

Heat map

A grid of rows and columns shaded light to dark in one hue, the figure in the cell and a scale key. When tickets arrive: weekdays × working hours.

HeatMap

When tickets arrive

Average tickets per hour — Riyadh time

08:0009:0010:0011:0012:0013:0014:0015:0016:0017:00
Sunday3798645432
Monday2687644332
Tuesday2577534321
Wednesday2566533321
Thursday2454322111
Friday0011101110
Saturday0111111100
LowerHigher0 – 9

Waterfall

A bridge from one figure to another: each change floats from the running total, coloured by whether it is good news — for open tickets, a rise is bad.

Waterfall

Open-ticket bridge this week

From Sunday morning to now

  • Total
  • Increase
  • Decrease

Open-ticket bridge this week

From Sunday morning to now

  • Total
  • Increase
  • Decrease

Tables and filters

The ticket register as it works on the support desk: search, filters and saved views, a floating bar for bulk actions, a side sheet that opens the ticket, and a switch between table, cards and board. Then the table’s states: compact and grouped, empty, empty because of filters, loading or failed to load.

Ticket register

The filter bar above the table: saved views, search, filters and their chips, and the table / board switch. Tick rows to raise the floating action bar; click a row to open its sheet.

FilterBar + DataTable + useTableState
⁦24⁩ results
Export CSV
Suggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.Time left on the resolve time promised for the ticket’s priority. The clock pauses while the ticket waits for the client.Actions
WhatsApp messages not showing on customer recordsRS4-2026-0396TFTamkeen FinanceCRM — TamkeenReopenedHighSLA breached· ⁦1⁩h ⁦35⁩m lateYSYousef Al-ShammariE-invoicing specialist13 hours ago
Import leads from an exhibitionRS4-2026-0360MTMasar Travel & TourismCRM — MasarReopenedLowSLA breached· ⁦1⁩h ⁦35⁩m lateYSYousef Al-ShammariE-invoicing specialistyesterday
Main website down with a 502 errorDTM-2026-0420DLDuroob LogisticsDuroob hostingIn progressCriticalNearing SLA· ⁦38⁩m leftTATurki Al-AnaziSystems & hosting engineer25 minutes ago
System very slow in the morningsRS4-2026-0384JPAl-Jazira Plastics FactoryAl-Jazira Plastics hostingIn progressMediumNearing SLA· ⁦38⁩m leftTATurki Al-AnaziSystems & hosting engineer19 hours ago
Mada and Apple Pay payments failingDTM-2026-0408ARAl-Rashed Trading GroupAl-Rashed online storeAwaiting assignmentCriticalNearing SLA· ⁦1⁩h ⁦4⁩m leftUnassigned6 hours ago
Store stock doesn’t match the warehouseDTM-2026-0372SDSufrat Al-Deera RestaurantsSufrat Al-Deera orderingAwaiting assignmentMediumNearing SLA· ⁦1⁩h ⁦4⁩m leftUnassignedyesterday
Invoices rejected by the ZATCA platformDTM-2026-0417ARAl-Rashed Trading GroupFatoora — Al-Rashed GroupAvailable to takeCriticalWithin SLA· ⁦5⁩h ⁦12⁩m leftUnassigned2 hours ago
Nafath sign-in not workingDTM-2026-0399NHAl-Nukhba Specialist HospitalAl-Nukhba patient portalAwaiting internal actionCriticalWithin SLA· ⁦5⁩h ⁦12⁩m leftLGLama Al-GhamdiApplication support specialist11 hours ago
Invoice QR code won’t scanRS4-2026-0381JPAl-Jazira Plastics FactoryFatoora — Al-Jazira PlasticsAvailable to takeMediumWithin SLA· ⁦5⁩h ⁦12⁩m leftUnassigned21 hours ago
Attachment upload fails on the request formDTM-2026-0363ACAl-Ahsa Charity SocietyBeneficiary portal — Al-BirAwaiting internal actionMediumWithin SLA· ⁦5⁩h ⁦12⁩m leftLGLama Al-GhamdiApplication support specialistyesterday
⁦1⁩–⁦10⁩ of ⁦24⁩

Compact and grouped

Compact density for the supervisor’s screens, rows grouped by status with a count per group. Change the grouping from the toolbar.

DataTable defaultDensity='compact' groupings
⁦24⁩ results
Suggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.Time left on the resolve time promised for the ticket’s priority. The clock pauses while the ticket waits for the client.
Mada and Apple Pay payments failingDTM-2026-0408CriticalNearing SLA· ⁦1⁩h ⁦4⁩m leftUnassigned
Store stock doesn’t match the warehouseDTM-2026-0372MediumNearing SLA· ⁦1⁩h ⁦4⁩m leftUnassigned
Invoices rejected by the ZATCA platformDTM-2026-0417CriticalWithin SLA· ⁦5⁩h ⁦12⁩m leftUnassigned
Invoice QR code won’t scanRS4-2026-0381MediumWithin SLA· ⁦5⁩h ⁦12⁩m leftUnassigned
Appointment reminder SMS not reaching patientsDTM-2026-0411HighWithin SLA· ⁦21⁩h leftSMSultan Al-MutairiApplication support specialist
Same slot booked twiceDTM-2026-0375HighWithin SLA· ⁦21⁩h leftSMSultan Al-MutairiApplication support specialist
Main website down with a 502 errorDTM-2026-0420CriticalNearing SLA· ⁦38⁩m leftTATurki Al-AnaziSystems & hosting engineer
Live Zoom session link won’t openDTM-2026-0405HighWithin SLA· ⁦1⁩d ⁦16⁩h leftKSKhalid Al-SubaieSupport developer
Most trucks’ GPS trackers offlineDTM-2026-0393CriticalWithin SLA· ⁦21⁩h leftDMDana Al-MalkiIntegration & API specialist
System very slow in the morningsRS4-2026-0384MediumNearing SLA· ⁦38⁩m leftTATurki Al-AnaziSystems & hosting engineer
Enrol a new batch of trainees in a courseDTM-2026-0369MediumWithin SLA· ⁦1⁩d ⁦16⁩h leftKSKhalid Al-SubaieSupport developer
Geofence alerts firing for no reasonDTM-2026-0357MediumWithin SLA· ⁦21⁩h leftDMDana Al-MalkiIntegration & API specialist
November payroll run failsDTM-2026-0414CriticalClock pausedYSYousef Al-ShammariE-invoicing specialist
Month-end close is blockedDTM-2026-0387CriticalClock pausedYSYousef Al-ShammariE-invoicing specialist
WPS file rejected by MudadDTM-2026-0378HighClock pausedYSYousef Al-ShammariE-invoicing specialist
Inventory valuation wrong after stock countRS4-2026-0351MediumClock pausedYSYousef Al-ShammariE-invoicing specialist
Nafath sign-in not workingDTM-2026-0399CriticalWithin SLA· ⁦5⁩h ⁦12⁩m leftLGLama Al-GhamdiApplication support specialist
Attachment upload fails on the request formDTM-2026-0363MediumWithin SLA· ⁦5⁩h ⁦12⁩m leftLGLama Al-GhamdiApplication support specialist
WhatsApp messages not showing on customer recordsRS4-2026-0396HighSLA breached· ⁦1⁩h ⁦35⁩m lateYSYousef Al-ShammariE-invoicing specialist
Import leads from an exhibitionRS4-2026-0360LowSLA breached· ⁦1⁩h ⁦35⁩m lateYSYousef Al-ShammariE-invoicing specialist
Login OTP not arrivingDTM-2026-0402CriticalMet the SLAOBOmar BawazirMobile developer
App crashes on Android 14RS4-2026-0366HighMet the SLAOBOmar BawazirMobile developer
Donation receipts not being sentDTM-2026-0390HighMissed the SLALGLama Al-GhamdiApplication support specialist
Monthly donation charged twiceDTM-2026-0354MediumMet the SLALGLama Al-GhamdiApplication support specialist
⁦1⁩–⁦24⁩ of ⁦24⁩

Cards

The same rows as cards, for a narrow screen or a quick review, with the same selection and paging.

DataTable renderCard defaultView='cards'
⁦24⁩ results
  • DTM-2026-0420

    Main website down with a 502 error

    In progressCriticalNearing SLA· ⁦38⁩m left
    DLDuroob LogisticsTATurki Al-AnaziSystems & hosting engineer
  • DTM-2026-0417

    Invoices rejected by the ZATCA platform

    Available to takeCriticalWithin SLA· ⁦5⁩h ⁦12⁩m left
    ARAl-Rashed Trading GroupUnassigned
  • DTM-2026-0414

    November payroll run fails

    Awaiting clientCriticalClock paused
    DLDuroob LogisticsYSYousef Al-ShammariE-invoicing specialist
  • DTM-2026-0411

    Appointment reminder SMS not reaching patients

    AssignedHighWithin SLA· ⁦21⁩h left
    NHAl-Nukhba Specialist HospitalSMSultan Al-MutairiApplication support specialist
  • DTM-2026-0408

    Mada and Apple Pay payments failing

    Awaiting assignmentCriticalNearing SLA· ⁦1⁩h ⁦4⁩m left
    ARAl-Rashed Trading GroupUnassigned
  • DTM-2026-0405

    Live Zoom session link won’t open

    In progressHighWithin SLA· ⁦1⁩d ⁦16⁩h left
    UFAl-Ufuq Private SchoolsKSKhalid Al-SubaieSupport developer
⁦1⁩–⁦6⁩ of ⁦24⁩

Empty table

No tickets at all: the table says so quietly and suggests the next step.

DataTable rows={[]} empty={…}
Suggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.Time left on the resolve time promised for the ticket’s priority. The clock pauses while the ticket waits for the client.

No open tickets

All quiet. New tickets appear here as soon as they arrive from the portal or WhatsApp.

Empty because of filters

The filters match no ticket: the table says the filters are why and offers to clear them.

DataTable filtered onClearFilters
Status: CancelledPriority: Critical
⁦0⁩ results
Suggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.

No results match the filters

Try another word or loosen the filters to see more.

Loading and error

Skeleton rows while loading, and an error state whose «Try again» goes back to loading, then the rows.

DataTable loading error={{ onRetry }}
TitleNumberStatusPrioritySuggested by the impact × urgency matrix when raised; the supervisor confirms it or changes it with a written reason.SLATime left on the resolve time promised for the ticket’s priority. The clock pauses while the ticket waits for the client.Owner

Foundations

Colour, type and corners, then the smallest pieces every screen is built from: buttons, badges, avatars and hints.

Colours

Every colour on screen is one of these names, never a hand-typed code. Click a colour to copy its name.

tokens · ColorSwatch

Two colours make an identity its own: the brand and the accent, plus the ink. The three are written in ONE block at the top of the stylesheet, and everything shown here is derived from them — light and dark alike. Change that block and every screen changes.

Brand

Accent

Ink steps

Surfaces

Lines

The four status tones

ToneSoftSolidWhen
BrandbrandSampleSampleThe main action, links, selection
NeutralneutralSampleSampleDrafts, secondary actions
AccentaccentSampleSampleWhat deserves a gentle look
SuccesssuccessSampleSampleApproved, complete, on time
WarningwarningSampleSampleClose to due, needs a change
DangerdangerSampleSampleLate, delete, reject
InfoinfoSampleSampleIn review, a note

Status tones are fixed: they never follow a rebrand, so red is red in every identity.

Gradient and the deep shade

Signature gradient

For the ONE key action on a screen

bg-signature

Glow

For a page hero or an empty state

bg-glow

Deep shade

The sidebar and tooltips

bg-deep

Type scale

Eight sizes are enough for every screen. Figures are always Latin digits and line up in columns.

text-*
text-4xl36px

This week's report is ready for review

A big figure in a page header

text-3xl30px

This week's report is ready for review

Screen title

text-2xl24px

This week's report is ready for review

Section title

text-lg18px

This week's report is ready for review

Card title

text-[15px]15px

This week's report is ready for review

Lead paragraph

text-sm14px

This week's report is ready for review

Body text

text-xs12px

This week's report is ready for review

A hint under a field

text-2xs11px

This week's report is ready for review

A small label over a group

Corners and shadows

One base corner (10 px) the others derive from, and five shadows for elevation. In dark mode the shadows go deeper.

rounded-* · shadow-*

Corners

sm · 6
md · 8
lg · 10
xl · 14
2xl · 18
full · ∞

Shadows

xs
sm
md
lg
xl
brand

Button

Six shapes, each taking any tone. The signature shape is for the ONE key action of a screen.

Button

Shapes

Every shape in every tone

Sizes

With an icon

States

Button group

Buttons joined in one frame, or a spaced row. The group's size and tone apply to every button in it.

ButtonGroup

Joined

Spaced

Icon button

A square button with only its icon. Its name is required, and shows as a tooltip on hover or focus.

IconButton

Shapes

EditShareSaveDeleteSearchCtrlK

Sizes

SmallMediumLargeUnavailable

Split button

A main action with an arrow beside it that opens the alternatives. The menu floats above everything, is never clipped, and Escape closes it.

SplitButton

Shapes

States

Copy button

Copies the text and says «Copied» right where it was pressed, for two seconds; a refused clipboard says «Copy failed». Built on the kit's button; the starter's path re-exports it.

A starter pieceCopyButton

With words

https://house.example/invite/7Q2K

Icon only — the word in the tooltip, plus a toast

https://house.example/k/7Q2KCopy link

Badge

A short word for a state: soft, solid or outlined, with a dot or an icon.

Badge

Soft

ApprovedIn reviewLateDraftUrgent

Solid · Outline

ApprovedLateIn reviewUrgent

Sizes

SmallMediumLarge

Tag

A tag that toggles when pressed (for filters), is removed with its button, or carries a person.

Tag · Chip

For filtering

Removable

FinanceHuman resources

People

Sara Al-QahtaniFahad Al-OtaibiPremium Hospitality Co.

Count and status dot

A small number in a bubble that reads «99+» past its limit, and a dot that breathes for what is live now.

Count · StatusDot

Shapes

34299+59⁦7⁩ unread

States

Online nowSyncingOffline

Avatar

Two initials in a colour fixed to the name everywhere, or the photo when there is one, with a presence dot.

Avatar · AvatarGroup

Sizes

States

Group

Sara Al-QahtaniFahad Al-OtaibiNoura Al-ShehriKhalid Al-DosariReem Al-HarbiAbdullah Al-GhamdiSara Al-QahtaniFahad Al-OtaibiNoura Al-Shehri

Tooltip

A short word on hover or keyboard focus. It even tells why a disabled button is disabled.

Tooltip

With a shortcut

DownloadSearchCtrlK

On a disabled button

Opens once the report is approved

Keys and separator

Key caps (⌘ on Apple devices, Ctrl elsewhere) and a separating line, with or without a word.

Kbd · Separator

Kbd

To search, press CtrlK⇧↵Esc

Separator

or
Edit
Share
Print

Fields and forms

Every field here is built on the starter's Field: the label above the box, its message under it, one height and one border for every box. Lists and the calendar open over the page and nothing clips them.

Field

The label, the control, and its own message under it. Every field in the library goes through it.

A starter pieceField

States

We only send the sign-in link there.

Text box

One line, with an icon, a prefix or a suffix, and a character counter when needed.

TextField · Input

States

Empty

Filled

Disabled

Read only

Checking

Extras

+966
https://

Accepted

Shown at the top of the report.0 / 40

Sizes

Long text

Grows with the text up to a limit, then scrolls; counts characters when the text has a maximum.

TextAreaField · Textarea

States

Sent to the reviewer with the request.82 / 200

Number box

The − and + buttons (hold to keep going), the arrow keys, a minimum and a maximum; digits typed on an Arabic keyboard read as Latin.

NumberField

States

hours

From 0 to 80, in half-hour steps.

%

Disabled

Search box

A clear button appears as you type, Esc clears, and a keyboard shortcut puts the cursor in it.

SearchField

States

Password

The eye shows what was typed. The box runs left to right in both languages.

A starter piecePasswordInput

States

At least twelve characters.

Disabled

Pick list

Every choice from a list goes through it. A short list opens as it is; a long one (seven options or more) has a search box that understands Arabic spelling.

A starter pieceSearchSelect

States

Short list

Long list with search

Disabled

Date box

Typed or picked from the calendar. Accepts 25/2/2027 and Arabic digits and turns them into year-month-day.

A starter pieceDateInput

States

This month or the next only.

Date with Hijri

The same date box, with the same day in the Umm al-Qura calendar under it (or beside it), following every pick.

DateField

Layouts

Hijri: 3 Jumada I 1448 AH

Hijri under the box

The Hijri date shows here once a day is picked

Hijri beside it

Both dates together

For a date in a table or a card: Gregorian and Hijri, on one line or two, with the governing calendar emphasised.

DualDate

Display

One line

2026-10-143 Jumada I 1448 AH

Two lines

2026-10-143 Jumada I 1448 AH

Hijri governs

2026-10-143 Jumada I 1448 AH

Amounts

The official riyal sign (SAMA), drawn, before the figure in both languages. Digits are always Latin.

Money · RiyalSign

Display

Full

4,850,000

Compact

4.9M

With the code

SAR 1,250

With halalas

312.50

Amount box

Groups the thousands as you type, and turns Arabic digits into Latin ones.

MoneyInput

States

Stored value: nothing yet

Disabled

Verification code in boxes

A fixed-length code sent by text or email. Typing moves to the next box, pasting fills them all, Arabic digits read as Latin. Not the same as the two-step sign-in box below.

OtpInput

States

Empty

Complete

Split 3 + 3

Two-step sign-in code

One box that takes an authenticator app code (six digits) or a backup code shaped XXXXX-XXXXX.

A starter pieceCodeInput

States

File upload

Drop or browse; the files are listed under it with their size and a remove button. It draws progress only for a real upload the screen reports.

FileDrop

States

Checkbox

On or off, and «some» when a group is partly chosen.

Checkbox

States

The starter's own checkbox (for a form posted as is)

Checkbox group

Several options under one label, with «select all».

CheckboxGroup

States

One of several

A vertical or horizontal list, with a line of explanation per option.

RadioGroup

Layouts

Choice cards

For a decision where each option needs a sentence.

RadioCards

Switch

For a setting that applies at once, with no save button.

Switch

States

Not changed from here — held by: Faisal Al-Otaibi

The reason in the tooltip (hover, or Tab to it)

«Change request» type — the last one acceptedAt least one type stays acceptedAt least one type stays accepted

Sizes

Segmented buttons

Always one choice among a few, such as how a list is shown.

SegmentedControl

States

Layouts

Filter chips

Several choices switched on and off, with an optional count.

ToggleChips

States

Sizes

Slider

One value or a range, with marks under it and a bubble with the value while dragging.

Slider

States

Windows and menus

Everything that appears over the page: windows, the side panel, the confirm question, toasts, menus and anchored panels — and with them the page’s quiet states: empty, loading, progressing. Every list and calendar here opens whole above the window that holds it, and Escape closes only the top layer.

Dialog

A window over the page for a short task: a form, details, or a decision. Escape, a click outside or the close button closes it, and focus returns to the button that opened it. On a phone it rises from the bottom edge.

Dialog · DialogClose

Sizes

A form inside a dialog

Side panel

A panel that slides in from the screen’s end (the right in English) for longer things: filters, a record’s details, settings. Same fields; their lists open whole above it.

Sheet

Confirm question

Asks before something that cannot be undone. A click outside does not close it — the answer is yes or no. It can ask for a word to be typed first, and run the work inside itself until it finishes. It opens from anywhere, even from inside an open dialog.

AlertDialog · useConfirm

Tones

Toast

A short word in the screen’s corner about something that happened elsewhere or in the background. It leaves by itself, its timer stops while the pointer is over it, and it shows above any open window.

toast · Toaster
A toast never replaces the result where it lands: a saved form shows its new values, a table dims in place while it refreshes. A toast is for what has no place on this screen: a job finished in the background, an undo for a row that left the list.

Tones

Cases

Popover

A small panel under a button: a quick filter, a two-field form, a piece of information. Focus moves into it; a click outside or Escape closes it.

Popover

Hover card

Shows when the pointer rests on a name or a link, or when the keyboard reaches it, after a short moment. For previews only — no buttons in it.

HoverCard
Reviewed by Mona Alqahtani
Mona AlqahtaniOperations manager · Operationsm.alqahtani@example.com
and forwarded to Finance.

Screen-level note

A note about the whole screen: a refusal, an absence, a standing condition. Not where a field’s error goes — that is written under the field itself.

A starter pieceCallout
This data is a demo and is not saved.
You may not open this screen. Ask your branch manager for access.

Waiting where the result lands

While a result is on its way, the place it will appear says so: the button spins until the new data is really on screen, and the list dims in place instead of being replaced.

A starter piececomponents/Pending

A button and a list sharing one pending state

  • Row ⁦1⁩
  • Row ⁦2⁩
  • Row ⁦3⁩

The list never disappears and keeps its scroll: it only dims until the new row arrives.

A panel with nothing to show yet

Loading…

The spinner on its own

Checking the code…

Empty state

A small drawing, a title, one line of help, and the next step. Four kinds: nothing yet, no results, all done, and failed to load.

EmptyState

Nobody here yet

Add the first person to the branch and the list will appear here.

No results for “senior accountant”

Try a shorter word, or clear the filters.

Nothing is waiting for you

You have reviewed every request. We will tell you when a new one arrives.

Could not load the list

The connection to the server dropped. Nothing was lost.

Small — inside a card or a table

No results for “senior accountant”

Try a shorter word, or clear the filters.

Skeleton

The shape of what is coming, with a calm light crossing it in the reading direction. For a first load only: what is already shown and refreshing stays put and dims.

Skeleton · SkeletonText · SkeletonAvatar · SkeletonCard · SkeletonTable · SkeletonTableRow

Blocks and lines

A card

A table

Progress

How far along something measurable is: a file uploading, a wizard’s steps, a share of a target. Digits are always Latin.

Progress · SegmentedProgress · ProgressRing

The bar

Uploading the payroll sheet64%
Approved⁦3⁩ of ⁦5⁩
Storage92%

Nearly full — delete old attachments.

Preparing the file…

Steps

Step ⁦2⁩ of ⁦4⁩ · Attachments

The ring

64%
64%
18of 25

Figures and charts

The figures that matter, in a tile, and the charts that explain them. Their colours come from the chart slots in the brand block, their digits are Latin, and under Arabic time runs from the right.

Stat card

A label, a figure, the change against the last period, and a small trend. The change is coloured by whether it is good news, not by its sign: fewer failed sign-ins is green.

StatCard

Active people

1,284

+12%

against last month

Failed sign-ins

37

−18%

fewer is better

Sign-ins today

412

+6%

against yesterday

On-time attendance

92%

target 95%

Requests waiting

8

0%

same as last week — the whole tile is a link

Bar chart

A comparison between categories: columns for months, stacked when made of parts, or horizontal rows for long Arabic names. Hover to see the details.

BarChart

Stacked columns

JanFebMarAprMayJun
  • Approved
  • Waiting for review
  • Returned for changes

Horizontal rows

  • Field operations42
  • Engineering31
  • Customer care24
  • Finance12

Line chart

A trend over time, one line or more, with a filled area under the first and a dashed target line.

LineChart
  • This year
  • Last year

Donut

The parts of one whole. It turns from the top in the reading direction; hover a part to see its figure and share in the middle.

Donut

80

requests

  • Approved4657%
  • Waiting for review1823%
  • Returned for changes911%
  • Drafts79%

Sparkline

A trend without axes, beside a figure or inside a tile. It ends on a dot at the last value.

Sparkline
Sign-ins29
On-time attendance92
Failed sign-ins6
New people7

Chart legend

Explains a chart’s colours. The eight slots follow the brand and the dark theme; no colour is written by hand.

ChartLegend

The eight chart slots

  • chart-1
  • chart-2
  • chart-3
  • chart-4
  • chart-5
  • chart-6
  • chart-7
  • chart-8

With values

  • Approved46
  • Waiting for review18
  • Returned for changes9