The provider confirmed a cooling failure. We moved the services to the standby region; expected back within the hour.
DTM-P-0001Data Time for Information Technology
Outage at the cloud provider’s data centre
Duroob hostingby Majed Al-ShehriOpened 23 days ago
- Children in progress
- 0
- Clients informed
- 1
- Updates broadcast
- 1
- Silent since the last update
- 0
- Handled in
- 1h 45m
of 3 child tickets
Owners of the linked reports
Last update 23 days ago
Wrote nothing since the last broadcast
2026-10-29 08:40
Closing summary
This summary arrived as the resolution inside every open child ticket, and each client was asked to confirm the closure.
All services were back at 10:20 am after moving to the standby region; no data was lost, and the backup was rerun successfully.
3 tickets resolved by the summaryClosed 23 days ago
Updates
Every update broadcast and what happened to it on the clients’ channels.
Closed with one summary · 2026-10-29 10:25
- MS
Majed Al-ShehriInfrastructure team lead2026-10-29 09:10· 23 days ago Parent opened with 3 tickets · Majed Al-Shehri · 2026-10-29 08:40
Child tickets3
Each ticket stays with its owner; the update reaches it from here.
- DL
DTM-2026-0357ClosedResolved by the parent’s summary
None of Duroob’s systems open since 8 am
Duroob Logistics
- Owner
- TATurki Al-AnaziAvailable
- SLA
- Met the SLA
- Last update:Delivery of the last broadcast update to this ticket on the client’s channel.
- Read
- DL
DTM-2026-0358ClosedResolved by the parent’s summary
The server status board shows red for every service
Duroob Logistics
- Owner
- TATurki Al-AnaziAvailable
- SLA
- Met the SLA
- Last update:Delivery of the last broadcast update to this ticket on the client’s channel.
- Delivered
- DL
- Owner
- MSMunira Al-SahliOff duty
- SLA
- Met the SLA
- Last update:Delivery of the last broadcast update to this ticket on the client’s channel.
- Delivered

