Demo clockDark mode

System very slow in the mornings

DTM-2026-0322ClosedMediumMet the SLAPortal

Duroob LogisticsDuroob hostingopened 52 days ago

  1. 29 September 2026
    1. DL
      Saud Al-KhalidiDuroob LogisticsPortal2026-09-29 13:42

      Original reportPerformance issue · Impact Moderate · Urgency High

      Between ⁦7:30⁩ and ⁦9:00⁩ am pages take over ⁦20⁩ seconds to load at the Khobar and Dammam branches. After ⁦9⁩ it goes back to normal. This has been happening for about a week.

    2. Ticket created from Portal.2026-09-29 13:42
    3. Assigned to Turki Al-Anazi.2026-09-29 14:58
    4. TA
      2026-09-29 16:57Support agentTurki Al-Anazi

      Thanks for the detail. We’ll review server and database load during that window and get back to you with what we find.

      SampleFrom the demo’s sample history — never actually sent to any number.Approved template: Update outside the windowSaud Al-Khalidi
    5. Internal noteTATurki Al-AnaziNever sent, never shown to the client2026-09-29 17:35

      Nightly backup job is scheduled at ⁦04:00⁩ UTC = ⁦7:00⁩ Riyadh and runs for two hours, colliding with the heavy dashboard queries. Moved the cron to ⁦23:00⁩ UTC.

    6. TA
      2026-09-29 17:45Information request · clock pausedSupport agentTurki Al-Anazi

      Is the slowness on every screen or a specific one? Roughly how many users are on the system at that time?

      SampleFrom the demo’s sample history — never actually sent to any number.Approved template: Update outside the windowSaud Al-Khalidi
    7. DL
      Saud Al-KhalidiDuroob LogisticsWhatsApp2026-09-29 22:48

      ⁦DTM-2026-0322⁩ — It’s worst on the “Sales Dashboard” and the daily reports. About ⁦60⁩ staff log in at the start of the shift.

    8. The client replied; the ticket is back «In progress» and the clock resumed.2026-09-29 22:48
  2. 30 September 2026
    1. TA
      2026-09-30 05:45Support agentTurki Al-Anazi

      Configuration error: Moved the nightly backup to ⁦2:00⁩ am Riyadh time, as it was overlapping the start of the working day. Page loads are back under ⁦3⁩ seconds.

      SampleFrom the demo’s sample history — never actually sent to any number.Saud Al-Khalidi
Stays inside the platform — never sent, never shown to the client

Only Infrastructure & Hosting team members and administrators see it. It never enters the message log.