Demo clockDark mode

Invoice QR code won’t scan

RS4-2026-0211ClosedMediumMet the SLAPortal

Al-Jazira Plastics FactoryFatoora — Al-Jazira Plasticsopened 43 days ago

  1. 8 October 2026
    1. JP
      Eng. Fahad Al-BuainainAl-Jazira Plastics FactoryPortal2026-10-08 11:51

      Original reportIncident · Impact Moderate · Urgency High

      Customers at our Olaya branch say the QR code on simplified invoices won’t scan in the ZATCA verification app. It only happens on receipts printed at the till; the PDF version scans fine.

    2. Ticket created from Portal.2026-10-08 11:51
    3. Assigned to Ahmed Al-Ansari.2026-10-08 14:04
    4. AA
      2026-10-08 17:26Support agentAhmed Al-Ansari

      Thanks for reporting this. We’ll check the size and print resolution of the code on the receipt printer and get back to you.

      SampleFrom the demo’s sample history — never actually sent to any number.Eng. Fahad Al-Buainain

      Skipped — the client turned this kind off

    5. Internal noteAAAhmed Al-AnsariNever sent, never shown to the client2026-10-08 17:48

      Receipt template is set for ⁦80⁩ mm paper, so the QR shrinks to ⁦18⁩ mm and loses detail. Added a dedicated ⁦58⁩ mm template with a ⁦30⁩ mm code.

    6. AA
      2026-10-08 19:11Support agentAhmed Al-Ansari

      Configuration error: Set the receipt template to ⁦58⁩ mm paper and enlarged the QR code; verified it scans in the ZATCA app on ⁦5⁩ test receipts.

      SampleFrom the demo’s sample history — never actually sent to any number.Approved template: Resolution doneEng. Fahad Al-Buainain
Stays inside the platform — never sent, never shown to the client

Only Enterprise Systems team members and administrators see it. It never enters the message log.