Original reportPerformance issue · Impact Moderate · Urgency High
Between 7:30 and 9:00 am pages take over 20 seconds to load at the Khobar and Dammam branches. After 9 it goes back to normal. This has been happening for about a week.
Duroob LogisticsDuroob hostingopened 24 days ago
Original reportPerformance issue · Impact Moderate · Urgency High
Between 7:30 and 9:00 am pages take over 20 seconds to load at the Khobar and Dammam branches. After 9 it goes back to normal. This has been happening for about a week.
Thanks for the detail. We’ll review server and database load during that window and get back to you with what we find.
Is the slowness on every screen or a specific one? Roughly how many users are on the system at that time?
It’s worst on the “Sales Dashboard” and the daily reports. About 60 staff log in at the start of the shift.
Configuration error: Moved the nightly backup to 2:00 am Riyadh time, as it was overlapping the start of the working day. Page loads are back under 3 seconds.
Only Infrastructure & Hosting team members and administrators see it. It never enters the message log.