Original reportIncident · Impact Moderate · Urgency Urgent
Three times this morning the same dental slot at our Al-Malqa branch was booked for two patients — one through the app and one at reception. It’s been very embarrassing with patients.
Basma Dental ClinicsMawid — Basma Dentalopened 10 days ago
Original reportIncident · Impact Moderate · Urgency Urgent
Three times this morning the same dental slot at our Al-Malqa branch was booked for two patients — one through the app and one at reception. It’s been very embarrassing with patients.
Sorry for the trouble. We’re reviewing the booking log for those three slots to find the cause right away.
Race between two requests within a second: availability check then insert with no lock. Added a unique constraint on (doctor_id, slot_start) plus SELECT FOR UPDATE — Faisal load-tested it with 50 concurrent requests.
Software bug fixed: Fixed the fault that let two channels book the same slot at the same moment; the system now rejects the second booking and suggests the next free slot.
Only Web & Portals team members and administrators see it. It never enters the message log.