Demo clockDark mode

One-halala VAT difference

RS4-2026-0242ClosedMediumMet the SLAPortal

Al-Jazira Plastics FactoryFatoora — Al-Jazira Plasticsopened 2 days ago

  1. 18 November 2026
    1. JP
      Eng. Fahad Al-BuainainAl-Jazira Plastics FactoryPortal2026-11-18 15:15

      Original reportIncident · Impact Moderate · Urgency High

      On some multi-line invoices the VAT total differs from the sum of line VAT by SAR ⁦0.01⁩, for example invoice ⁦INV-2026-08812⁩. Our external auditor wants it fixed before the quarter close.

    2. Ticket created from Portal.2026-11-18 15:15
    3. Assigned to Yousef Al-Shammari.2026-11-18 15:57
    4. YS
      2026-11-18 18:19Support agentYousef Al-Shammari

      Noted. We’ll review how VAT is rounded on that invoice and come back to you.

      SampleFrom the demo’s sample history — never actually sent to any number.Eng. Fahad Al-Buainain

      Skipped — the client turned this kind off

    5. Internal noteYSYousef Al-ShammariNever sent, never shown to the client2026-11-18 18:35

      Total was computed by rounding each line then summing, while the XML computes from the unrounded sum. Unified to invoice-level ROUND_HALF_UP per the ZATCA spec.

  2. 19 November 2026
    1. YS
      2026-11-19 06:48Support agentYousef Al-Shammari

      Software bug fixed: Fixed the VAT rounding logic to work at invoice level per the ZATCA spec, and issued correction notes for the four affected invoices.

      SampleFrom the demo’s sample history — never actually sent to any number.Approved template: Resolution doneEng. Fahad Al-Buainain
Stays inside the platform — never sent, never shown to the client

Only Enterprise Systems team members and administrators see it. It never enters the message log.